Industrial buildings and facilities

Survey of the load-bearing structures (frames) of boilers No. 7 and 8 at Toplofikatsiya Ruse PLC

Survey of the load-bearing structures (frames) of boilers No. 7 and 8 at Toplofikatsiya Ruse PLC

Ruse

Restoration and reconstruction after failure of the load-bearing structure (frame) of boiler No. 5 at Toplofikatsiya Ruse PLC

Restoration and reconstruction after failure of the load-bearing structure (frame) of boiler No. 5 at Toplofikatsiya Ruse PLC

Ruse

Connection between the gas ducts of boilers No. 7 and 8 for the operation of K8 with the K7 electrostatic precipitator (ESP) at Toplofikatsiya Ruse PLC

Connection between the gas ducts of boilers No. 7 and 8 for the operation of K8 with the K7 electrostatic precipitator (ESP) at Toplofikatsiya Ruse PLC

Ruse

Structural survey and preparation of the structural design part for the project: installation of EIRICH R28/41 mixer for the new furnace, Rubin plant

Structural survey and preparation of the structural design part for the project: installation of EIRICH R28/41 mixer for the new furnace, Rubin plant

Pleven

Emergency measures and subsequent restoration of a coal supply trestle over road III-554 following a failed support frame, Brikel PLC

Emergency measures and subsequent restoration of a coal supply trestle over road III-554 following a failed support frame, Brikel PLC

Galabovo

Design of site trestles for a biodiesel installation, Slanchevi Lachi - Bulgaria PLC

Design of site trestles for a biodiesel installation, Slanchevi Lachi - Bulgaria PLC

Provadia

Design of site trestles, transfer towers and tensioning stations of the coal and limestone transport system to a new fluidised bed boiler at Deven TPP PLC

Design of site trestles, transfer towers and tensioning stations of the coal and limestone transport system to a new fluidised bed boiler at Deven TPP PLC

Deven

Survey and technical expert assessment of reinforced concrete flues and columns to hot-water boilers HWB No. 1, No. 2, No. 3 and No. 4 at Heating Plant "Lyulin", Toplofikatsiya Sofia PLC

Survey and technical expert assessment of reinforced concrete flues and columns to hot-water boilers HWB No. 1, No. 2, No. 3 and No. 4 at Heating Plant "Lyulin", Toplofikatsiya Sofia PLC

Sofia

Survey of "Brestnik Winery"

Survey of "Brestnik Winery"

Brestnik, Plovdiv Region

Structural survey for renovation / repair of 2x400 m3 tanks, Iliyantsi Oil Terminal, OMV Bulgaria Ltd

Structural survey for renovation / repair of 2x400 m3 tanks, Iliyantsi Oil Terminal, OMV Bulgaria Ltd

Iliyantsi

Structural survey of a 60m high reinforced concrete chimney in UPI XI with ID 10450.502.2565

Structural survey of a 60m high reinforced concrete chimney in UPI XI with ID 10450.502.2565

Velingrad

Structural survey (structural design part and Geotechnics) of the project: 60m high reinforced concrete chimney to Furnace No. 3, Rubin plant

Structural survey (structural design part and Geotechnics) of the project: 60m high reinforced concrete chimney to Furnace No. 3, Rubin plant

Pleven

Structural survey (structural design part and Geotechnics) of the project: Shop No. 1 low part, section at Furnaces No. 1 and No. 2, Rubin plant

Structural survey (structural design part and Geotechnics) of the project: Shop No. 1 low part, section at Furnaces No. 1 and No. 2, Rubin plant

Pleven

Structural survey of Building No. 1 and Building No. 2 of the plant for production of plastic piping systems Pipelife Bulgaria Ltd

Structural survey of Building No. 1 and Building No. 2 of the plant for production of plastic piping systems Pipelife Bulgaria Ltd

Botevgrad

Survey and expert assessment of defects in industrial concrete flooring, Multi-purpose non-residential building

Survey and expert assessment of defects in industrial concrete flooring, Multi-purpose non-residential building

Krivina, Sofia Municipality

Survey and expert evaluation of defects in industrial concrete flooring and demolished partition walls, Logistics warehouse

Survey and expert evaluation of defects in industrial concrete flooring and demolished partition walls, Logistics warehouse

Gara Elin Pelin village

Structural survey (structural design part and Geotechnics) of the project: Trestle No. 2 for raw materials and transfer tower from the Material Shop to Shop No. 1, Rubin plant

Structural survey (structural design part and Geotechnics) of the project: Trestle No. 2 for raw materials and transfer tower from the Material Shop to Shop No. 1, Rubin plant

Pleven

Design of the structural design part of the project: TIM Logistics Base

Design of the structural design part of the project: TIM Logistics Base

Lyaskovets